Since the
introduction of MEP BIM modeling, the AEC industry has made significant
progress. From improving schematics to streamlining multi-disciplinary
activities, MEP (Mechanical, Electrical, and Plumbing) BIM modeling has
redefined the construction landscape.
Compared to the dated approach, MEP BIM services bring unparalleled
clarity to design, structural analysis, and project coordination. They can also reduce errors and redundancies,
resulting in improved cost savings and streamlined workflow. In short, MEP
modeling services are a boon to projects struggling with design, scheduling,
structural testing, coordination, plumbing, HVAC installation, and so on. Read on to discover how exactly MEP BIM
modeling is transforming projects by reducing construction errors and rework.
How Does MEP
BIM Modeling Overcome Rework and Errors?
Seasoned MEP
BIM services leverage MEP BIM modeling to streamline the entire project on
various grounds, including design, scheduling, material take-off, etc.
1. Clash
Detection & Resolution
Preparing for construction can be taxing by
streamlining the design and resources. While stakeholders ensure attention to
detail, errors inevitably kick in, derailing the project’s efficacy.
MEP modeling services overcome such errors via
BIM software, enabling stakeholders to spot conflicts in a virtual yet
realistic simulation environment.
Autodesk Navisworks, BIM 360 Clash Detection, and Solibri Model Checker
are some of the best clash detection tools.
For example,
in a hospital project, these BIM tools can help identify conflict between a
load-bearing beam and ductwork, enabling engineers to make rational adjustments
to the layout before installation.
2. Accurate
3D Visualization
Engineers and contractors can use MEP BIM
modeling to view the entire project in a 3D model, unlocking architectural and
structural designs that need improvement or adjustment.
For example, in a retail space project, a 3D
BIM model empowers contractors to spot misalignment in ductwork and electrical
conduits. Revit MEP, Trimble SysQue, and
ArchiCAD are three applications that use 3D modeling to improve project
visualization.
3. Precise
Fabrication & Installation
MEP BIM
modeling can improve installation and material take-off for fabrication
projects by analyzing data from multi-disciplinary teams. Prefabrication facilities increasingly use
BIM models like Fabrication and CADmep to produce various components with
precise sizes and dimensions due to the precise results. This can reduce
assembly rework and errors for enhanced efficiency.
4. Improved
Coordination & Collaboration
Cloud-based BIM platforms keep communication issues at bay so that stakeholders can communicate with each other when it matters. For example, tools like BIM 360, Trimble Connect, and Revizto can be a game changer in a project wherein coordination among architects, MEP engineers, and contractors is paramount for prompt and accurate decision-making.
5. Automated
Error Detection
BIM tools can spot potential errors, like
feeble electrical conduits or compromised pipelines, before the
construction. This enables stakeholders
to work closely with maximum accuracy, paving an error-free roadmap to
construction.
The top tools that MEP modeling services use
for error identification include Solibri Model Checker, Navisworks Manage, and
Tekla BIMsight.
6.
Data-Driven Decision Making
The data
used in MEP BIM modeling come from a variety of departments. Such data can help
optimize layout, minimize inefficiencies, and boost system performance. For example, pipe routing is not easy to
design and install in a smart building project.
It is highly prone to costly reworks and
reduced energy efficiency. IES VE
simulations backed by BIM data can overcome such issues by ensuring seamless
installation. It also provides grounds
for boosted energy efficiency and reduced operational costs.
7. Cost
& Time Savings
Stakeholders can avoid costly rework and
potential errors through MEP BIM modeling prior to construction. Stakeholders
can, for instance, use BIM models like 360 Cost Management, Procore, and
PlanGrid during a fabrication project, which is time-consuming and prone to
material wastage, to improve material take-off and reduce assembly issues.